CAR policy – damage during execution and third-party liability
Policy taken out by the contractor covering damage to the works and installations, existing ones included, occurring during execution of the works, and third-party liability.
Legal references (4)
- Article 117(10): delivered to the contracting authority at least ten days before the works are handed over; the sum insured is normally equal to the contract value.
- Third-party liability limit of 5% of the sum insured for the works, with a minimum of €500,000 and a maximum of €5,000,000.
- Cover runs from the handover of the works until provisional acceptance or the certificate of proper execution, and in any event for no more than twelve months from completion.
- Where the contract provides for a maintenance period, the policy is replaced by cover relating to that period.
Ten-year inherent defects and ten-year liability policies
For works above twice the EU threshold, a ten-year indemnity policy against total or partial collapse of the works and serious construction defects, together with a ten-year third-party liability policy.
Legal references (3)
- Article 117(11): indemnity paid to the client as soon as it is requested, even while liability is still being established; indemnity limit of between 20% and 40% of the value of the works carried out.
- The ten-year cover starts on provisional acceptance or on the certificate of proper execution, and in any event once twelve months have passed from completion of the works.
- Ten-year liability policy: indemnity of 5% of the value of the works, with a minimum of €500,000 and a maximum of €5,000,000, for ten years.
Ten-year inherent defects policy – properties under construction
Policy that the developer takes out for the benefit of the buyer and hands over on transfer of ownership. Failure to hand it over makes the contract void, and only the buyer may rely on that.
Legal references (2)
- Article 4 of Legislative Decree 122/2005: direct material damage to the property, damage to third parties included, caused by total or partial collapse or by serious construction defects appearing after the final contract is signed.
- Standard form under Ministerial Decree 154/2022, for policies taken out from 5 November 2022: the minimum content may be varied only in the buyer's favour.