The point is Article 1945 of the Civil Code
Article 1945 of the Civil Code allows the guarantor to raise against the creditor the same defences that the debtor could raise.
The GSE requires this to be waived: the insurer pays on first demand and cannot go into the merits of the underlying relationship.
The wording of the guarantee is the standard form published by the GSE for each measure. It must be completed without alteration.
In the standard forms for the PNRR Facilities (agrivoltaics, biomethane, CACER, ecological practices) and for Energy Release 2.0, the guarantor waives the benefit of prior enforcement (Article 1944 of the Civil Code), the rights under Articles 1945, 1947 and 1955, and the time limits of Article 1957.
In the social housing standard form, Measure M7 I.17, the guarantee also applies by way of derogation from Article 1939 of the Civil Code.
We already know who signs it
We know the insurers that underwrite the GSE standard forms with these waivers: we do not work by trial and error.
We take the case straight to the insurer suited to that wording and negotiate it with their underwriting department, working on the best rate available in the market.
GSE guarantee for the advance payment of a PNRR grant
Agrivoltaics and energy communities (CACER): advance of up to 30% of the grant, with a guarantee equal to 100% of the amount advanced.
Social housing, Measure M7 I.17 (REPowerEU): advance of up to 30% of the grant, with an independent guarantee payable on first demand provided in the interest of the ESCo, equal to 100% of the advance. There must be a single guarantee, as several guarantees cannot be combined to cover the amount requested.
Parco Agrisolare: advance of up to 30% of the grant, with a surety guarantee.
Completion guarantee – agrivoltaics, biomethane, ecological practices
If the works do not start within 3 months of the Concession Agreement being finalised, a guarantee for completion of the investment is required in order to avoid forfeiture of the grant.
Agrivoltaics: 5% of the maximum reference investment cost multiplied by the nominal capacity of the plant. The maximum costs are set out in Annex 1 to Ministerial Decree 436/2023: €1,700 per kW up to 300 kW and €1,500 per kW above that.
Biomethane: 5% of the investment cost of the plant.
Ecological practices: 5% of the maximum eligible specific costs set out in Annex 1 to the decree.